The erected PV plant in Zwettl has already been put into operation. In just a few weeks, approximately 980 solar panels were installed over an area of more than 1,650 square meters. This is around 80% of the roof area of the warehouse on the B36 trunk road, which is thus used to generate environmentally friendly electricity. The modern 332-kWp photovoltaic system will cover a significant proportion of the company’s own electricity requirements.

Further information
Parameters |
---|
PV power |
332 kWp |
Occupied area |
4.000 m² |
Annual production |
337.976 kWh |
CO2 emissions avoided |
120 t/year |
Supply of households (on balance per year) |
97 households |
Possible travel distances with the e-car (on balance per year) |
50 circumnavigations of the earth |