At the Korneuburg site, RWA’s new headquarters, a 740 kWp PV system was installed in autumn 2019 on the roofs of the spare parts warehouse, the Lagerhaus Technology Center, John Deer World, the central seed warehouse, and the newly opened organic seed factory, in addition to an existing 300 kWp system. The system will be operated as a surplus feed-in to cover the company’s own needs. A special feature here is the decentralized connection concept with full controllability by the grid operator, in the interests of the TOR producers.

Further information

Parameters
PV power (kWp)
740
Occupied area  (m²)
9.000
Annual production (kWh)
745.180
CO2 emissions avoided
t/year (0,3543 kg/kWh)
264